Making a list

I’m not getting much done lately. I think it’s because I’m to the point where I could do a lot. Previously I was always waiting on parts (motor before motor installation…) Now I almost have everything so I’m undecided on making the cables or finishing the battery racks or setting up the controller wiring or finishing the vacuum pump wiring, finding a motor for the power steering pump, etc.

So I’m making a list, somewhat flow chart to figure out logically what should be done before everything else. Here are some of the items I’m trying to work in.

  • Complete the motor mounts, then design a battery rack for the top of the motor
  • Complete the front battery rack that incorporates a mount for the power steering motor
  • Measure amp draw from headlights, wipers, etc. to size DC-DC convertor
  • Finalize battery layout to determine cable lengths, cut and crimp

Hopefully the mounts will be completed this weekend.  My wife had a good idea for a brace that would encircle the motor – a clamp like those used on hoses, just much bigger.  After a little looking there is a company that allows you to design a clamp any size needed.  If I use the company and it works out I’ll post more info on that.

Tags:

Comments are closed.